Take the header and place it in the rough opening. Lay the header on the floor and remove the track covers (2) and the (floor mounting brackets) along with the t-guide. One set for each side of the wall to be used in step 5.Ĥ. Remove the steel posts and the (floor mounting bracket) see next step, and assemble them by snapping them securely into each other. The floor mounting brackets and t-guide are indicated and are temporarily secured.ģ. It will have the track and a track cover already assembled along with the top mounting brackets for the steel posts. It will be a 2x4 or 2圆 or custom width depending upon your application. Remove the head piece from the packaging. Other wall widths can easily be accommodated but will need minor modification to the head piece.Ģ. If your rough opening is framed correctly you are ready to proceed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |